That's a wrap on construction for 2024!
Construction has officially wrapped for the season. What a difference a few months can make! Check out these photos for a before and after comparison. There was lots accomplished over the past several months, including:
- Removal of more than 1000 truckloads of old soil and construction material
- Over 900 truckloads of fresh new soil and base materials
- Grading of the site for new amenities
- Installation of geotextile fabric and compacted clay material
- Installation of underground water and stormwater utilities
- Formwork for concrete installation
- Shotcrete application to form skate park bowl and pump track
- Installation of electrical and light poles
- Preparation of site for the winter
Construction will resume when the snow melts next spring and the park is expected to re-open by the end of summer 2025.
Share That's a wrap on construction for 2024! on Facebook
Share That's a wrap on construction for 2024! on Twitter
Share That's a wrap on construction for 2024! on Linkedin
Email That's a wrap on construction for 2024! link

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends