2023 Pressure Reducing Valve Installation - Update September 20

This project includes the installation of Pressure Reducing Valves (PRV's) on four different locations in the City. The PRV's are to reduce high incoming water pressure and provide more functional water distribution along the north portion of the City.

Streamline Construction will begin work on September 18th, through mid October tentatively. Roads will be sequentially closed during PRV installation, one location at a time. Signage and notices will be provided prior to the work commencing.

See below for attached timelines and areas of road closure:

Aspenglen Drive (PRV #6) - September 18 - 30


Fairway Drive (PRV #8) - September 25 - Oct 7

Fieldstone Park (PRV #7) - Date to be determined

Longview Drive (PRV #9) - Date to be determined


Share 2023 Pressure Reducing Valve Installation - Update September 20 on Facebook Share 2023 Pressure Reducing Valve Installation - Update September 20 on Twitter Share 2023 Pressure Reducing Valve Installation - Update September 20 on Linkedin Email 2023 Pressure Reducing Valve Installation - Update September 20 link

2023 construction has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>